• What is your standard lead time?

For forged small-size valves not over 2 inches, the lead time is 4-7 weeks. For valves with forgings or castings in stock, we can deliver within 4 weeks.

For newly manufactured valves, the standard lead time is typically 7 to 10 weeks. For expedited orders, special designs, or large quantities, please contact us directly to confirm the lead time.